Hattie Street over Menominee River Bridge Deck Replacement
« Return to Project SearchThe City of Marinette selected Ayres for the deck replacement design for the Hattie Street Bridge over the Menominee River. The structure design included the bridge deck replacement, parapet walls, and decorative railing, as well as surface repairs and replacement of five double T-beams for the fishing deck on the south side of the bridge. The elevation of the bridge deck was raised approximately 4 inches at the centerline to correct the flat crown and improve constructability. Approximately 250 feet of approach work was designed, including the intersection of Riverside Drive and Hattie Street.
The Menominee River is the boundary between Wisconsin and the Upper Peninsula of Michigan, so the project was coordinated with Wisconsin and Michigan state agencies.
Services included topographic survey, preliminary and final bridge plans, preliminary and final road plans, erosion control plans, agency and utility coordination, environmental permitting, project specifications, and estimates.
- Phil Verville III, Senior Transportation Engineer
- Ryan Schaitel, Project Manager/Transportation Engineer
- Andy Dana, Project Manager/Transportation Engineer
- Dave Pantzlaff, Director of Midwest Transportation Services
- Brian Lambert, Project Manager
- Jacob Zander, Project Manager/Structural Engineer
- Arlen Beaudette, Project Manager/Structural Engineer
- Jeffrey Koppensteiner, Technical Supervisor - Geospatial Services
- Michael Stoffel, Senior Project Manager
Project Information
Client's NameCity of Marinette
LocationMarinette, WI
Primary ServiceStructural Design & Analysis
MarketLocal Government