Search Results for "roundabout"

US 41 Brown County

This project is one of several segments of the US 41 Corridor that will be expanded from four to six lanes to increase capacity along the highway in Brown and Winnebago Counties as part of a $1.5 billion mega project. The construction cost for this segment was approximately $240 million. Ayres’ services for this section… Read More »

Altoona River Prairie Development

Ayres assisted the City of Altoona with master planning through final design for the rapid development of the River Prairie area, including landscape architecture, site civil and roadway design, and traffic engineering. The initial project involved providing services all the way from consent-building through plan approval for the 40-acre town center property, which includes new… Read More »

Bong Memorial Bridge Rehabilitation

The Wisconsin Department of Transportation hired Ayres to design the rehabilitation of the 1.5-mile-long Bong Memorial Bridge and its 1.3-mile urban approach in Superior. The project included placing a concrete deck overlay on approximately 600,930 square feet of existing bridge deck and replacing the 18 sets of modular expansion joints and six strip seal joints.… Read More »